
10 2332-20 POWER METER MODULE
201
1
2
3
4
5
6
7
8
9
APPX
IDX
10
10.3.4 Connecting to the Measured Line
• In order to prevent electric shock and short-circuit acci-
dents, shut off the power to the line to be measured before
connecting the clamp sensors and voltage cords.
• U INPUT terminals (U1 and U2) share the N terminal; inputs
to these terminals are not insulated from each other. Be
careful to avoid electric shock and short-circuiting.
• The CLAMP SENSOR INPUT terminals are not insulated from
the U INPUT terminals. Be careful to avoid electric shock and
short-circuiting when using the U INPUT terminals.
• To avoid short circuits and potentially life-threatening haz-
ards, never attach the clamp sensor to a circuit that oper-
ates at more than the maximum rated voltage, or over bare
conductors.
• Clamp sensor should only be connected to the secondary
side of a breaker, so the breaker can prevent an accident if a
short circuit occurs. Connections should never be made to
the primary side of a breaker, because unrestricted current
flow could cause a serious accident if a short circuit occurs.
• If the secondary circuit is opened while electricity is being
sent through the CT, very high and dangerous voltage may
be generated at the secondary side terminal.
• Be sure to cover the measured line when live to avoid elec-
tric shock and short-circuiting.
When the clamp sensor is opened, do not allow the metal
part of the clamp to touch any exposed metal, or to short
between two lines, and do not use over bare conductors.
• Avoid stepping on or pinching cables, which could damage the
cable insulation.
• Do not input voltage or current to the U INPUT terminals and
CLAMP SENSOR INPUT terminals when module power is OFF.
This will avoid damaging the module.
Summary of Contents for 2300 Smart Site
Page 1: ...SMART SITE Instruction Manual 2300 February 2011 Revised edition 5 2300A981 05 11 02H...
Page 13: ...Contents XII...
Page 21: ...8 Service...
Page 87: ...74 4 2304 20 PULSE MODULE...
Page 105: ...92 5 2304 21 PULSE MODULE...
Page 253: ...240 12 2342 20 OUTPUT MODULE...
Page 275: ...262 14 2351 AIR MODULE 2352 20 WIRE MODULE...
Page 285: ...272 15 2353 20 LAN MODULE...
Page 317: ...304 18 2362 20 DC POWER MODULE...
Page 345: ...332 20 2392 01 02 MODULE BASE...
Page 347: ...334 21 Maintenance and Service...
Page 348: ......
Page 349: ......
Page 350: ......
Page 351: ......
Page 352: ......
Page 353: ......
Page 354: ......
Page 355: ......
Page 356: ......
Page 357: ......
Page 358: ......
Page 359: ......
Page 360: ......
Page 361: ......
Page 362: ......
Page 363: ......
Page 364: ......
Page 365: ......
Page 366: ......