
9 2331-20 POWER METER MODULE
175
1
2
3
4
5
6
7
8
9
APPX
IDX
Connect the sensors and cables to the measured line according to
the connection diagram.
1.
Connect the clamp sensors to the line.
2.
Connect the voltage cables to the line.
❖
❖
Instruction manuals of the clamp sensors
Completing Measurement
1.
Remove the voltage cables.
2.
Remove the clamp sensors.
Source(K)
Load(L)
• Ensure that the measured line is correctly set and connection
correctly made to ensure accurate measurement.
• Clamp the cladding of the wire by placing the clamp with the
arrow on it facing the load side.
• This module can be used for a single-phase, 2-wire line to a 3-
phase, 4-wire line. Each channel is not independent, however,
and thus the module cannot be used as two single-phase watt-
meters.
• When measuring a 3-phase line, be sure to align the phase
sequence of the measured line with the order of measurement
channels of the module.
Summary of Contents for 2300 Smart Site
Page 1: ...SMART SITE Instruction Manual 2300 February 2011 Revised edition 5 2300A981 05 11 02H...
Page 13: ...Contents XII...
Page 21: ...8 Service...
Page 87: ...74 4 2304 20 PULSE MODULE...
Page 105: ...92 5 2304 21 PULSE MODULE...
Page 253: ...240 12 2342 20 OUTPUT MODULE...
Page 275: ...262 14 2351 AIR MODULE 2352 20 WIRE MODULE...
Page 285: ...272 15 2353 20 LAN MODULE...
Page 317: ...304 18 2362 20 DC POWER MODULE...
Page 345: ...332 20 2392 01 02 MODULE BASE...
Page 347: ...334 21 Maintenance and Service...
Page 348: ......
Page 349: ......
Page 350: ......
Page 351: ......
Page 352: ......
Page 353: ......
Page 354: ......
Page 355: ......
Page 356: ......
Page 357: ......
Page 358: ......
Page 359: ......
Page 360: ......
Page 361: ......
Page 362: ......
Page 363: ......
Page 364: ......
Page 365: ......
Page 366: ......