251
96-8000 Rev AC
May 2010
Maintenance
4. Add Mobil Mobil SHC 625 gear oil until the oil level is half way up the sight
glass.
5. Run a spindle warm-up and check for leaks.
hS 3/4/6/7 38-t
ool
t
ool
c
hanGer
M
aintenance
Six Months
• Lubricate the Magazine Drive Gear, Tool Pot and Changer Slide Rack us
-
ing red grease:
• Lubricate the Arm Shaft using Moly grease.
Annually
• Lubricate the Changer Slide Linear Guide with red grease.
Tool Pot Chain Tension
The tool pot chain tension should be checked regularly. Chain tension adjust
-
ment is performed in the lower left area of the magazine. Loosen the four
M12x50 SHCS from the front of the magazine. This will allow the plate to
move. Loosen the hex lock nut on the shaft and tighten the shaft using the hex
bolt. Lock in the adjustment with the hex lock nut, and retighten the four 12x50
SHCS. Tensioning will not change the indexed pot location, but check the align
-
ment between the manual tool push cylinder and the tool pot.
ec-S
erieS
P
allet
c
hanGer
r
otary
t
able
Oil Replacement
EC-300
Periodically check the oil level in the reservoir and keep it filled. It is not neces
-
sary to replace the oil.
.
Remove (8)
BHCS on
Bottom
Remove
(3) BHCS
on Sides
Clam
Shell
Rotary Table Oil Reservoir
Remove row
of (6) BHCS
on Top
EC-400 Full Fourth Axis Rotary Table
(Perform Every 2 years)
Summary of Contents for 96-8000
Page 15: ...6 96 8000 Rev AC May 2010 Mill Warning Decals ...
Page 16: ...7 96 8000 Rev AC May 2010 Safety Lathe Warning Decals ...
Page 41: ...32 96 8000 Rev AC May 2010 ...
Page 93: ...84 96 8000 Rev AC May 2010 ...
Page 129: ...120 96 8000 Rev AC May 2010 ...
Page 133: ...124 96 8000 Rev AC May 2010 ...
Page 268: ......
Page 269: ......