242
96-8000 Rev AC
May 2010
The grease system injects lubrication based on the distance of axis travel
instead of time. Grease is injected once any of the axes has traveled the dis
-
tance defined in parameter 811. This grease is distributed equally to each of
the lubrication points for all axes.
A full grease canister should last approximately one year.
Air/Oil System -
The minimal lubrication system for the spindle is an air/oil
mixture. The air/oil system injects lubrication based on the number of actual
revolutions of the spindle. A timed air/oil injection cycle is also used for low
speed spindle operation to ensure an adequate amount of lubrication to the
spindle.
A single tank of oil should last a minimum of 1 year of continuous spindle op-
eration.
.
Maintenance
Grease Canister Refill:
Note: Make sure to check the grease level regularly. If the reservoir
becomes completely empty, do not refill the reservoir and do not operate
the machine. Contact your dealer to have the system purged and primed
before you operate the machine.
Use one of the following Mobile Grade 0 greases to refill the grease canister.
Mobilux EP0
XHP-220
You can also order a refill bag using Haas part number 93-1293.
1. Disconnect machine air.
2. Use the provided wrench to loosen and remove the grease canis-
ter.
Summary of Contents for 96-8000
Page 15: ...6 96 8000 Rev AC May 2010 Mill Warning Decals ...
Page 16: ...7 96 8000 Rev AC May 2010 Safety Lathe Warning Decals ...
Page 41: ...32 96 8000 Rev AC May 2010 ...
Page 93: ...84 96 8000 Rev AC May 2010 ...
Page 129: ...120 96 8000 Rev AC May 2010 ...
Page 133: ...124 96 8000 Rev AC May 2010 ...
Page 268: ......
Page 269: ......