197
This operation is applicable to patches in the ACTIVE state only.
If the running of a patch is confirmed, after the system reboots, the patch will still be
effective.
Examples
Confirm the running of patch 3 and all the ACTIVE patches before patch 3.
<Sysname> system-view
[Sysname] patch run 3