Displaying and Maintaining Track Object(s)
To do…
Use the command…
Remarks
Display information about the
specified Track object or all
Track objects
display
track
{ track-entry-number | all }
Available in any view
Track Configuration Examples
Static Routing-Track-NQA Collaboration Configuration Example
Network requirements
z
The next hop of the static route from Switch A to Switch C is Switch B.
z
Configure Static Routing-Track-NQA collaboration on Switch A to implement real-time monitoring
of the validity of the static route to Switch C.
Figure 1-2
Network diagram for Static Routing-Track-NQA collaboration configuration
Vlan-int2
10.1.1.1/24
Vlan-int2
10.1.1.2/24
Vlan-int3
10.2.1.1/24
Switch C
Vlan-int3
10.2.1.2/24
Switch B
Switch A
Configuration procedure
1) Configure the IP address of each interface as shown in
.
2) Configure a static route on Switch A and associate it with the Track object.
# Configure the address of the next hop of the static route to Switch C as 10.2.1.1, and configure the
static route to associate with Track object 1.
<SwitchA> system-view
[SwitchA] ip route-static 10.1.1.2 24 10.2.1.1 track 1
3) Configure an NQA test group on Switch A.
# Create an NQA test group with the administrator
admin
and the operation tag
test
.
[SwitchA] nqa entry admin test
# Configure the test type as ICMP-echo.
[SwitchA-nqa-admin-test] type icmp-echo
# Configure the destination address as 10.2.1.1
[SwitchA-nqa-admin-test-icmp-echo] destination ip 10.2.1.1
# Configure the test frequency as 100 ms.
[SwitchA-nqa-admin-test-icmp-echo] frequency 100
Summary of Contents for S5500-SI Series
Page 161: ...3 10 GigabitEthernet1 0 1 2 MANUAL...
Page 220: ...1 7 Clearing ARP entries from the ARP table may cause communication failures...
Page 331: ...1 7 1 1 ms 1 ms 1 ms 1 1 6 1 2 1 ms 1 ms 1 ms 1 1 4 1 3 1 ms 1 ms 1 ms 1 1 2 2 Trace complete...
Page 493: ...2 8...
Page 1111: ...1 10 Installing patches Installation completed and patches will continue to run after reboot...