This chapter describes how to set up and start the LCR-6000 Series LCR
Meter.
Incoming Inspection
Environmental Requirements
Cleaning
How to Remove the Handle
1.1 Incoming Inspection
After you receive the instrument, perform the following
checks during unpacking according to the following
procedure:
WARNING
If the external face of the instrument (such as
the cover, front/rear panel, VFD screen, power
switch, and port connectors) appears to have
been damaged during transport, do not turn on
the power switch. Otherwise, you may get an
electrical shock.
Make sure that the packing box or shock-absorbing
material used to package the instrument has not been
damaged.
Refer to the <Packing List> in the packing box, check
that all packaged items supplied with the meter have been
provided as per the specified optioned.