![background image](http://html.mh-extra.com/html/goulds-pumps/xhd/xhd_installation-operation-and-maintenance-manual_2247661125.webp)
Figure 116: Expeller installation
6.4.6.8 Reassembly for Metal-Lined
The reassembly steps for Metal-lined and Rubber-lined differ. This section, beginning with
Install the cas-
ing volute liner
and ending with
Install suction half casing with other suction half components attached
,
pertains to Metal-lined pumps.
For Rubber-lined pumps, refer to the sub-section,
6.4.6.14 Reassembly for Rubber-Lined on page 126
.
6.4.6.9 Install the casing volute liner - Metal-lined
NOTICE:
When the Dynamic Seal option is provided, be sure the power end and expeller assembly are
adjusted prior to volute liner installation so that the expeller does not interfere with the installa-
tion of the volute liner.
1.
Coat the threads of the casing volute liner retention studs (356K) that will be inserted into the casing
volute liner (561) with anti-seize compound.
2.
Insert the casing volute liner retention studs into the casing volute liner (561) using a metric stud
driver.
356K
356K
561
561
Figure 117: Volute liner stud installation
6.4 Reassembly
XHD Installation, Operation, and Maintenance Manual
123
Summary of Contents for XHD
Page 1: ...Installation Operation and Maintenance Manual XHD ...
Page 2: ......