ATTENTION
Extraction of smoke gases must be earthed in accordance with regulations in force. (Earthing
connection is required by law).
Earthing must be independent of combustion unit.
Regarding dimensions and material, from which it is made, the flue pipe must conform to standards
UNI 9615-9731, UNI 10683 - EN1856-1.
Flue pipes in poor condition and/or made of unsuitable materials (asbestos, zinced sheet metal etc.,
with rough or porous surfaces) are prohibited by law and compromise proper boiler operation.
Smoke can be extracted through a traditional flue pipe (see figure below) provided that the following
rules are met:
Check condition of flue pipe maintenance. For proper maintenance and/or restoration
contact chimney sweep service.
Extraction of smoke gases can be connected directly to flue pipe only if it has a maximum
dimension of 20 x 20 cm or diameter of 20 cm and is fitted with inspection hole.
If the flue pipe is of greater dimensions, a stainless pipe (with required diameter) with proper
insulation must be installed into it.
Make sure that the connection with the flue pipe is properly sealed.
Avoid contact with flammable material (such as wood ashes), and, in any case, insulate them
with fire-resistant material.
When using connections between the pellet boiler and flue pipe, it is mandatory to use joints with
cleaning doors (
figure 3
). Use of joints with cleaning doors enables regular cleaning without the need
to disassemble pipes. Exhaust fumes in flue connection are under slight pressure. Therefore, it is
compulsory to check that the cover for cleaning ash is completely hermetically closed and that it
remains in this state after each cleaning. Ensure proper reassembly and check condition of the seal.
Figure 3: Cleaning unit
Summary of Contents for Aqua ECOLOGIC
Page 32: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 32 Figure 12...
Page 41: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 41 service...
Page 42: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 42 service...
Page 43: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 43 service...
Page 44: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 44 service...
Page 45: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 45 service...
Page 52: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 52...