
ECOLOGIC 30 | instructions for use, maintenance and installation |
June 2015
10
Layout and structure of the space, where the flue is installed, needs to be analyzed. If it passes
through walls and/or roof, it must be properly installed in accordance with fire prevention safety
standards.
Ensure that there is enough air for proper combustion in the space, where the pellet boiler is
installed. If boiler ECOLOGIC 30 lacks oxygen/air, the boiler displays an alarm. External supply or
intake of external air requires a pipe with a diameter of at least 110 mm with maximum length of 10
m. Each 90° joint requires a deduction of 1 m in line length. If the air supply is longer, diameter of air
intake pipe must be increased.
In case of a grid on the facade, draught opening must be 100 cm² or larger.
The device operates at 220 V – 50 Hz. Make sure that the electrical cables are not laid under the
boiler, that they are far away from hot surfaces and that they do not touch sharp parts, which could
damage them. If the pellet boiler is under electrical overload, life expectancy of electrical component
greatly reduces.
ATTENTION
Never turn off the boiler by pulling the electrical cable from the socket, while fire is still
burning in the boiler. This could damage the boiler and seriously jeopardize its functioning.
3.2.
EXTRACTION OF SMOKE GASES
Extraction of smoke gases must be in accordance with regulations in force. Pipes for smoke gases
must not be connected to other discharge pipes of any other combustion device (
figure 2
). It is
prohibited to set up extraction of smoke gases into closed and/or semi-closed spaces, e.g. garage,
narrow passages or hallways, underpasses or any other similar spaces. If the flue connection is not
suitable, it must be implemented in accordance with previously provided requirements (point 3.1).
Figure 2
YES
NO
Summary of Contents for Aqua ECOLOGIC
Page 32: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 32 Figure 12...
Page 41: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 41 service...
Page 42: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 42 service...
Page 43: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 43 service...
Page 44: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 44 service...
Page 45: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 45 service...
Page 52: ...AQUA ECOLOGIC instructions for use maintenance and installation September 2015 52...