4 Working with the master
4.4.6 Trigger = Time
The flush process is started time-dependent and then implemented for all flush valves
in sequence, starting with the first flush valve.
The process is started when the set
start time
(default setting: 00:00 o'clock) is
reached. The stop criterion (1) for the flushing process is selectable: Either a defined
duration (default setting: 1 min), or a specific volume for each flush valve (2).
The lines are now flushed with water for the
duration
(default setting: 1 min). The set
number of executions
follows (default setting: 1). In the meantime, a pause is made
for the set
pause after execution
(default setting: 1 min). The
interval
(3) is once,
daily, weekly, or every 72 hours (every 3 days).
The flushing process ends when the stop criterion
duration
is reached (default
setting: 1 min)
In the case of single execution, set the desired day (date selection).
In the case of daily execution or execution every 72 hours, set the desired day
for the
first execution
(date selection).
38
Summary of Contents for Hycleen Automation System
Page 1: ...GF Piping Systems Hycleen Automation System User Guide Version 2 0...
Page 2: ...ii...
Page 4: ...5 2 Error messages 54 6 Compliance 6 1 FCC 55 6 2 ISED 56 7 CE Declaration iv...
Page 6: ...6...
Page 52: ......
Page 57: ......