5 Loosen the drain plug located at the bottom of
the filter. Allow the water to drain into a suitable
container until fuel starts to come out.
Immediately tighten the drain plug.
Note: Do not completely drain the filter.
a
fuel filter/water separator
b
drain valve
6 Clean up any fuel that may have spilled.
7 Start the engine from the ground controls and
check the fuel filter/water separator for leaks.
Explosion and fire hazard. If a fuel
leak is discovered, keep any
additional personnel from entering
the area and do not operate the
machine. Repair the leak
immediately.
8 Swing the engine back to its original position
and install the engine pivot plate retaining
fastener.
C-6
Check the Safety Envelope Limit
Switches and Angle Sensor,
S-80X
Note: Genie specifications require that this
procedure be performed every 500 hours or six
months, whichever comes first.
Testing the safety envelope system regularly is
essential to safe machine operation. Continued use
of an improperly operating safety envelope could
result in the system not restricting the range of
motion. Machine stablity could be compromised
resulting in the machine tipping over.
Note: Perform this procedure with the machine on a
firm, level surface with all weight, tools and
equipment removed from the platform.
Note: Start this procedure with the boom fully
retracted and in the stowed position.
Ground controls:
1 Turn the key switch to ground control and pull
out the red Emergency Stop button to the on
position.
2 Start the engine from the ground controls.
a
b
Summary of Contents for S-80
Page 1: ......
Page 6: ...February2012 S 80 S 85 S 80X PartNo 122985 This page intentionally left blank iv ...
Page 183: ...Section 6 Schematics February2012 6 5 6 6 Connector Pin Legend View 1 ...
Page 186: ...February2012 Section 6 Schematics 6 8 Connector Pin Legend View 2 6 7 ...
Page 223: ...Section 6 Schematics February2012 6 45 Electrical Schematic S 80X DeutzTD2011L04IModels 6 46 ...
Page 226: ...February2012 Section 6 Schematics 6 48 Electrical Schematic S 80X DeutzTD2011L04IModels 6 47 ...
Page 271: ...Section 6 Schematics February2012 6 93 Electrical Schematic S 80X Perkins804D 33Models 6 94 ...
Page 274: ...February2012 Section 6 Schematics 6 96 Electrical Schematic S 80X Perkins804D 33Models 6 95 ...
Page 331: ...Section 6 Schematics February2012 6 153 6 154 Continental TME27 Engine Harness ...
Page 334: ...February2012 Section 6 Schematics 6 156 Platform Level Cutout CTE Option 6 155 ...
Page 335: ...Section 6 Schematics February2012 6 157 Continental Options Schematic 6 158 ...
Page 338: ...February2012 Section 6 Schematics 6 160 Deutz and Perkins Options Schematic 6 159 ...
Page 339: ...Section 6 Schematics February2012 6 161 6 162 12 kW Hydraulic Generator Wiring Diagram ...
Page 342: ...February2012 Section 6 Schematics 6 164 6 163 12 kW Hydraulic Generator Electrical Schematic ...
Page 343: ...Section 6 Schematics February2012 6 165 Belt Driven Generator Option 6 166 ...
Page 346: ...February2012 Section 6 Schematics 6 168 Relay and Fuse Panel Legend 6 167 ...
Page 347: ...Section 6 Schematics February2012 6 169 6 170 Hydraulic Schematic 2WD Models ...
Page 350: ...February2012 Section 6 Schematics 6 172 Hydraulic Schematic 4WD Models 6 171 ...
Page 352: ...February2012 Section 6 Schematics 6 174 12 kW Hydraulic Generator Hydraulic Schematic 6 173 ...