Section 3 • Scheduled Maintenance Procedures
February 2012
CHECKLIST
B
PROCEDURES
B-7
Confirm the Proper
Brake Configuration
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper brake configuration is essential to safe
operation and good machine performance.
Hydrostatic brakes and hydraulically-released,
spring-applied individual wheel brakes can appear
to operate normally when they are actually not fully
operational.
1 Check each drive hub disconnect cap to be sure
it is in the engaged position.
B-8
Inspect the Tires, Wheels
and Lug Nut Torque
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Maintaining the tires and wheels in good
condition, including proper wheel fastener torque, is
essential to safe operation and good performance.
Tire and/or wheel failure could result in a machine
tip-over. Component damage may also result if
problems are not discovered and repaired in a
timely fashion.
Bodily injury hazard. An over-
inflated tire can explode and could
result in death or serious injury.
Tip-over hazard. Do not use
temporary flat tire repair products.
Note: The tires on some machines are foam filled
and do not need air added to them.
1 Check all tire treads and sidewalls for cuts,
cracks, punctures and unusual wear.
2 Check each wheel for damage, bends and
cracked welds.
3 Check each lug nut for proper torque. Refer to
Section 2,
Specifications.
4 Check the pressure in each air-filled tire. Add air
as necessary. Refer to Section 2,
Specifications.
disengaged position
engaged position
Summary of Contents for S-80
Page 1: ......
Page 6: ...February2012 S 80 S 85 S 80X PartNo 122985 This page intentionally left blank iv ...
Page 183: ...Section 6 Schematics February2012 6 5 6 6 Connector Pin Legend View 1 ...
Page 186: ...February2012 Section 6 Schematics 6 8 Connector Pin Legend View 2 6 7 ...
Page 223: ...Section 6 Schematics February2012 6 45 Electrical Schematic S 80X DeutzTD2011L04IModels 6 46 ...
Page 226: ...February2012 Section 6 Schematics 6 48 Electrical Schematic S 80X DeutzTD2011L04IModels 6 47 ...
Page 271: ...Section 6 Schematics February2012 6 93 Electrical Schematic S 80X Perkins804D 33Models 6 94 ...
Page 274: ...February2012 Section 6 Schematics 6 96 Electrical Schematic S 80X Perkins804D 33Models 6 95 ...
Page 331: ...Section 6 Schematics February2012 6 153 6 154 Continental TME27 Engine Harness ...
Page 334: ...February2012 Section 6 Schematics 6 156 Platform Level Cutout CTE Option 6 155 ...
Page 335: ...Section 6 Schematics February2012 6 157 Continental Options Schematic 6 158 ...
Page 338: ...February2012 Section 6 Schematics 6 160 Deutz and Perkins Options Schematic 6 159 ...
Page 339: ...Section 6 Schematics February2012 6 161 6 162 12 kW Hydraulic Generator Wiring Diagram ...
Page 342: ...February2012 Section 6 Schematics 6 164 6 163 12 kW Hydraulic Generator Electrical Schematic ...
Page 343: ...Section 6 Schematics February2012 6 165 Belt Driven Generator Option 6 166 ...
Page 346: ...February2012 Section 6 Schematics 6 168 Relay and Fuse Panel Legend 6 167 ...
Page 347: ...Section 6 Schematics February2012 6 169 6 170 Hydraulic Schematic 2WD Models ...
Page 350: ...February2012 Section 6 Schematics 6 172 Hydraulic Schematic 4WD Models 6 171 ...
Page 352: ...February2012 Section 6 Schematics 6 174 12 kW Hydraulic Generator Hydraulic Schematic 6 173 ...