3 - 10
S-80 • S-85 • S-80X
Part No. 122985
Section 3 • Scheduled Maintenance Procedures
February 2012
CHECKLIST
A
PROCEDURES
A-6
Check the High Pressure
Hydraulic Filter Condition
Indicator
Note: Genie specifications require that this
procedure be performed daily or every 8 hours,
whichever comes first.
Maintaining the high pressure hydraulic filter in
good condition is essential to good system
performance and safe machine operation. The filter
condition indicator will show when the hydraulic flow
is bypassing a clogged filter. If the filter is not
frequently checked and replaced, impurities will
remain in the hydraulic system and cause
component damage.
1 Open the engine side turntable cover.
2 Start the engine from the ground controls.
3 Change the engine idle to high rpm (rabbit
symbol).
4 Visually inspect the filter condition indicator.
Result: The filter condition indicator should be
operating with the plunger in the green area.
Result: If the indicator displays the plunger in
the red area, this indicates that the hydraulic
filter is being bypassed and the filter should be
replaced. See D-6,
Replace the Hydraulic
Filters.
A-7
Perform 30 Day Service
The 30 day maintenance procedure is a one time
sequence of procedures to be performed after the
first 30 days or 40 hours of usage, whichever
comes first. After this interval, refer to the
maintenance tables for continued scheduled
maintenance.
1 Perform the following maintenance procedures:
•
A-10
Grease the Turntable Rotation Bearing
and Rotate Gear
•
B-8
Inspect the Tires, Wheels and
Lug Nut Torque
•
B-9
Check the Drive Hub Oil Level and
Fastener Torque
•
B-24
Inspect the Boom Extend/Retract
Cables
•
D-4
Check the Turnable Rotation Bearing
Bolts
•
D-7
Replace the Hydraulic Filter Elements
Summary of Contents for S-80
Page 1: ......
Page 6: ...February2012 S 80 S 85 S 80X PartNo 122985 This page intentionally left blank iv ...
Page 183: ...Section 6 Schematics February2012 6 5 6 6 Connector Pin Legend View 1 ...
Page 186: ...February2012 Section 6 Schematics 6 8 Connector Pin Legend View 2 6 7 ...
Page 223: ...Section 6 Schematics February2012 6 45 Electrical Schematic S 80X DeutzTD2011L04IModels 6 46 ...
Page 226: ...February2012 Section 6 Schematics 6 48 Electrical Schematic S 80X DeutzTD2011L04IModels 6 47 ...
Page 271: ...Section 6 Schematics February2012 6 93 Electrical Schematic S 80X Perkins804D 33Models 6 94 ...
Page 274: ...February2012 Section 6 Schematics 6 96 Electrical Schematic S 80X Perkins804D 33Models 6 95 ...
Page 331: ...Section 6 Schematics February2012 6 153 6 154 Continental TME27 Engine Harness ...
Page 334: ...February2012 Section 6 Schematics 6 156 Platform Level Cutout CTE Option 6 155 ...
Page 335: ...Section 6 Schematics February2012 6 157 Continental Options Schematic 6 158 ...
Page 338: ...February2012 Section 6 Schematics 6 160 Deutz and Perkins Options Schematic 6 159 ...
Page 339: ...Section 6 Schematics February2012 6 161 6 162 12 kW Hydraulic Generator Wiring Diagram ...
Page 342: ...February2012 Section 6 Schematics 6 164 6 163 12 kW Hydraulic Generator Electrical Schematic ...
Page 343: ...Section 6 Schematics February2012 6 165 Belt Driven Generator Option 6 166 ...
Page 346: ...February2012 Section 6 Schematics 6 168 Relay and Fuse Panel Legend 6 167 ...
Page 347: ...Section 6 Schematics February2012 6 169 6 170 Hydraulic Schematic 2WD Models ...
Page 350: ...February2012 Section 6 Schematics 6 172 Hydraulic Schematic 4WD Models 6 171 ...
Page 352: ...February2012 Section 6 Schematics 6 174 12 kW Hydraulic Generator Hydraulic Schematic 6 173 ...