Part No. 122985
S-80 • S-85 • S-80X
3 - 37
Section 3 • Scheduled Maintenance Procedures
February 2012
CHECKLIST
B
PROCEDURES
B-23
Perform Hydraulic Oil Analysis
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Replacement or testing of the hydraulic oil is
essential for good machine performance and
service life. Dirty oil and suction strainers may
cause the machine to perform poorly and continued
use may cause component damage. Extremely
dirty conditions may require oil changes to be
performed more frequently.
Note: Before replacing the hydraulic oil, the oil may
be tested by an oil distributor for specific levels of
contamination to verify that changing the oil is
necessary.
If the hydraulic oil is not replaced at
the two year inspection, test the oil quarterly.
Replace the oil when it fails the test.
B-24
Inspect the Boom
Extend/Retract Cables
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
The boom extend/retract cables are responsible for
the extension and retraction of the number 3 boom
tube. Inspecting for foreign objects, damage and/or
improper adjustment of the boom extend/retract
cables and related components on a regular basis
is essential to good machine performance and safe
machine operation. The boom extend and retract
functions should operate smoothly and be free of
hesitation, jerking and unusual noise.
1 Raise the boom to horizontal and fully extend
the boom.
2 After the boom is fully extended, lower the boom
until the platform is at chest height. Turn the
machine off.
3 Remove the boom end cover retaining fasteners
and remove the cover.
4 Remove the retaining fasteners from the access
covers located on the side of the boom at the
platform end of the machine. Remove the
covers.
Summary of Contents for S-80
Page 1: ......
Page 6: ...February2012 S 80 S 85 S 80X PartNo 122985 This page intentionally left blank iv ...
Page 183: ...Section 6 Schematics February2012 6 5 6 6 Connector Pin Legend View 1 ...
Page 186: ...February2012 Section 6 Schematics 6 8 Connector Pin Legend View 2 6 7 ...
Page 223: ...Section 6 Schematics February2012 6 45 Electrical Schematic S 80X DeutzTD2011L04IModels 6 46 ...
Page 226: ...February2012 Section 6 Schematics 6 48 Electrical Schematic S 80X DeutzTD2011L04IModels 6 47 ...
Page 271: ...Section 6 Schematics February2012 6 93 Electrical Schematic S 80X Perkins804D 33Models 6 94 ...
Page 274: ...February2012 Section 6 Schematics 6 96 Electrical Schematic S 80X Perkins804D 33Models 6 95 ...
Page 331: ...Section 6 Schematics February2012 6 153 6 154 Continental TME27 Engine Harness ...
Page 334: ...February2012 Section 6 Schematics 6 156 Platform Level Cutout CTE Option 6 155 ...
Page 335: ...Section 6 Schematics February2012 6 157 Continental Options Schematic 6 158 ...
Page 338: ...February2012 Section 6 Schematics 6 160 Deutz and Perkins Options Schematic 6 159 ...
Page 339: ...Section 6 Schematics February2012 6 161 6 162 12 kW Hydraulic Generator Wiring Diagram ...
Page 342: ...February2012 Section 6 Schematics 6 164 6 163 12 kW Hydraulic Generator Electrical Schematic ...
Page 343: ...Section 6 Schematics February2012 6 165 Belt Driven Generator Option 6 166 ...
Page 346: ...February2012 Section 6 Schematics 6 168 Relay and Fuse Panel Legend 6 167 ...
Page 347: ...Section 6 Schematics February2012 6 169 6 170 Hydraulic Schematic 2WD Models ...
Page 350: ...February2012 Section 6 Schematics 6 172 Hydraulic Schematic 4WD Models 6 171 ...
Page 352: ...February2012 Section 6 Schematics 6 174 12 kW Hydraulic Generator Hydraulic Schematic 6 173 ...