Section 4 • Repair Procedures
Part No. 122985
S-80 • S-85 • S-80X
4 - 13
February 2012
PLATFORM COMPONENTS
4 Move the function enable button to either side
and hold the platform rotate toggle switch to the
left position until the platform is fully rotated to
the left. Continue holding the toggle switch until
air stops coming out of the bleed screw. Close
the bleed screw.
Crushing hazard. Keep clear of
the platform during rotation.
5 Open the bottom bleed screw on the rotator, but
do not remove it.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
6 Move the function enable toggle switch to either
side and hold the platform rotate toggle switch
to the right position until the platform is fully
rotated to the right. Continue holding the toggle
switch until air stops coming out of the bleed
screw. Close the bleed screw.
Crushing hazard. Keep clear of
the platform during rotation.
7 Clean up any hydraulic oil that may have
spilled.
8 Rotate the platform fully in both directions and
inspect the bleed screws for leaks.
2-4
Platform Overload System
How to Calibrate the Platform
Overload System (if equipped)
Calibration of the platform overload system is
essential to safe machine operation. Continued
use of an improperly calibrated platform overload
system could result in the system failing to sense
an overloaded platform. The stability of the
machine is compromised and it could tip over.
Note: Perform this procedure with the machine on
a firm, level surface.
1 Turn the key switch to platform control. Start the
engine and level the platform.
2 Determine the maximum platform capacity.
Refer to the machine serial plate.
3 Remove all weight, tools and accessories from
the platform.
Note: Failure to remove all weight, tools and
accessories from the platform will result in an
incorrect calibration.
4 Using a suitable lifting device, place a test
weight equal to the maximum platform capacity
at the center of the platform floor.
Summary of Contents for S-80
Page 1: ......
Page 6: ...February2012 S 80 S 85 S 80X PartNo 122985 This page intentionally left blank iv ...
Page 183: ...Section 6 Schematics February2012 6 5 6 6 Connector Pin Legend View 1 ...
Page 186: ...February2012 Section 6 Schematics 6 8 Connector Pin Legend View 2 6 7 ...
Page 223: ...Section 6 Schematics February2012 6 45 Electrical Schematic S 80X DeutzTD2011L04IModels 6 46 ...
Page 226: ...February2012 Section 6 Schematics 6 48 Electrical Schematic S 80X DeutzTD2011L04IModels 6 47 ...
Page 271: ...Section 6 Schematics February2012 6 93 Electrical Schematic S 80X Perkins804D 33Models 6 94 ...
Page 274: ...February2012 Section 6 Schematics 6 96 Electrical Schematic S 80X Perkins804D 33Models 6 95 ...
Page 331: ...Section 6 Schematics February2012 6 153 6 154 Continental TME27 Engine Harness ...
Page 334: ...February2012 Section 6 Schematics 6 156 Platform Level Cutout CTE Option 6 155 ...
Page 335: ...Section 6 Schematics February2012 6 157 Continental Options Schematic 6 158 ...
Page 338: ...February2012 Section 6 Schematics 6 160 Deutz and Perkins Options Schematic 6 159 ...
Page 339: ...Section 6 Schematics February2012 6 161 6 162 12 kW Hydraulic Generator Wiring Diagram ...
Page 342: ...February2012 Section 6 Schematics 6 164 6 163 12 kW Hydraulic Generator Electrical Schematic ...
Page 343: ...Section 6 Schematics February2012 6 165 Belt Driven Generator Option 6 166 ...
Page 346: ...February2012 Section 6 Schematics 6 168 Relay and Fuse Panel Legend 6 167 ...
Page 347: ...Section 6 Schematics February2012 6 169 6 170 Hydraulic Schematic 2WD Models ...
Page 350: ...February2012 Section 6 Schematics 6 172 Hydraulic Schematic 4WD Models 6 171 ...
Page 352: ...February2012 Section 6 Schematics 6 174 12 kW Hydraulic Generator Hydraulic Schematic 6 173 ...