Stress Echo
228
Vivid S5/Vivid S6 User Manual
R2424458-100 Rev. 2
Other options
Parameter
Description
Grid size:
• Enter the number of levels and projections
for the selected template.
Timers:
•
: starts T1 and T2 timers automatically
Auto-start analysis:
•
: displays the
Stress Echo Analysis
screen
when the last acquisition is
performed.
Smart Stress option is available for Vivid S6
only.
Smart Stress:
•
: stores a subset of the image acquisition
settings (geometry incl. zoom, gain,
compress, reject, power etc.) for each view
in the protocol. Smart Stress enables to set
image acquisition settings for each view at
baseline level and automatically get the
same image settings in the corresponding
views in the next levels.
In Continuous capture acquisition at peak
stress, the active cell must be moved
manually through the views using the arrow
buttons (or foot pedal).
Reference image
:
• When
Show Reference
is selected (see
page 227), selects either corresponding
baseline loop or corresponding loop from
the previous level to be displayed as
reference image during acquisition.
Summary of Contents for Vivid S5
Page 18: ...Revision History xvi Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 30: ...Introduction 12 Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 154: ...Basic scanning operations 136 Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 250: ...Stress Echo 232 Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 260: ...Contrast Imaging 242 Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 420: ...Quantitative Analysis 402 Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 508: ...Archiving 490 Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 600: ...Peripherals 582 Vivid S5 Vivid S6 User Manual R2424458 100 Rev 2 ...
Page 689: ......
Page 690: ......