GE Multilin
L60 Line Phase Comparison System
5-41
5 SETTINGS
5.2 PRODUCT SETUP
5
2.
All the LEDs are turned off, and then one LED at a time turns on for 1 second, then back off. The test routine starts at
the top left panel, moving from the top to bottom of each LED column. This test checks for hardware failures that lead
to more than one LED being turned on from a single logic point. This stage can be interrupted at any time.
3.
All the LEDs are turned on. One LED at a time turns off for 1 second, then back on. The test routine starts at the top left
panel moving from top to bottom of each column of the LEDs. This test checks for hardware failures that lead to more
than one LED being turned off from a single logic point. This stage can be interrupted at any time.
When testing is in progress, the LEDs are controlled by the test sequence, rather than the protection, control, and monitor-
ing features. However, the LED control mechanism accepts all the changes to LED states generated by the relay and
stores the actual LED states (on or off) in memory. When the test completes, the LEDs reflect the actual state resulting from
relay response during testing. The reset pushbutton will not clear any targets when the LED Test is in progress.
A dedicated FlexLogic™ operand,
LED TEST IN PROGRESS
, is set for the duration of the test. When the test sequence is ini-
tiated, the
LED TEST INITIATED
event is stored in the event recorder.
The entire test procedure is user-controlled. In particular, stage 1 can last as long as necessary, and stages 2 and 3 can be
interrupted. The test responds to the position and rising edges of the control input defined by the
LED TEST CONTROL
set-
ting. The control pulses must last at least 250 ms to take effect. The following diagram explains how the test is executed.
Figure 5–3: LED TEST SEQUENCE
APPLICATION EXAMPLE 1:
Assume one needs to check if any of the LEDs is “burned” through user-programmable pushbutton 1. The following set-
tings should be applied. Configure user-programmable pushbutton 1 by making the following entries in the
SETTINGS
Ö
PRODUCT SETUP
ÖØ
USER-PROGRAMMABLE PUSHBUTTONS
Ö
USER PUSHBUTTON 1
menu:
PUSHBUTTON 1 FUNCTION:
“Self-reset”
PUSHBTN 1 DROP-OUT TIME:
“0.10 s”
842011A1.CDR
READY TO TEST
Start the software image of
the LEDs
STAGE 1
(all LEDs on)
control input is on
Wait 1 second
dropping edge of the
control input
Restore the LED states
from the software image
rising edge of the
control input
STAGE 2
(one LED on at a time)
STAGE 3
(one LED off at a time)
rising edge
of the control
input
rising edge of the
control input
Set the
LED TEST IN PROGRESS
operand
Reset the
LED TEST IN PROGRESS
operand
rising edge of the
control input
Wait 1 second
rising edge of the
control input
time-out
(1 minute)
Summary of Contents for UR series
Page 2: ......
Page 4: ......
Page 12: ...xii L60 Line Phase Comparison System GE Multilin TABLE OF CONTENTS ...
Page 32: ...1 20 L60 Line Phase Comparison System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 54: ...2 22 L60 Line Phase Comparison System GE Multilin 2 2 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2 ...
Page 438: ...7 8 L60 Line Phase Comparison System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Page 478: ...8 40 L60 Line Phase Comparison System GE Multilin 8 3 FAULT LOCATOR 8 THEORY OF OPERATION 8 ...
Page 502: ...A 10 L60 Line Phase Comparison System GE Multilin A 1 PARAMETER LIST APPENDIXA A ...
Page 584: ...B 82 L60 Line Phase Comparison System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Page 622: ...D 10 L60 Line Phase Comparison System GE Multilin D 1 PROTOCOL APPENDIXD D ...
Page 634: ...E 12 L60 Line Phase Comparison System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...
Page 642: ...F 8 L60 Line Phase Comparison System GE Multilin F 3 WARRANTY APPENDIXF F ...