GE Power Management
SPM Synchronous Motor Protection & Control
9-
1
9 MODBUS COMMUNICATIONS
9.1 IMPLEMENTATION
9
9 MODBUS COMMUNICATIONS 9.1 IMPLEMENTATION
9.1.1 MODBUS PROTOCOL
The SPM supports a subset of the AEG Modicon Modbus RTU serial communication standard using a 2-wire
RS485 interface. The following commands are supported (Modbus names are in brackets):
•
03: Read Setpoints and Actual Values (read holding registers)
•
04: Read Setpoints and Actual Values (read input registers)
•
05: Execute Operation (force single coil; coil number 1 emulates the relay reset function)
•
06: Store Single Setpoint (preset single register)
•
07: Read Device Status (read exception status)
•
16: Store Multiple Setpoints (preset multiple registers)
9.1.2 PERFORMANCE REQUIREMENTS
•
Baud rates: 300, 600, 1200, 2400, 4800, 9600, 19200, 38400, 57600, 115200.
•
Turn around time less than 50 ms from receipt of last character to transmission of first character.
•
Two-wire RS485 connection.
•
Data frame fixed at 1 start, 8 data and 1 stop bit.
9.1.3 SETPOINTS
The following setpoints are required to set up the Modbus communications port:
CONFIGURATIONS \ RTU ADDRESS
:Range 1 to 254. Set to the SPM address
(must be unique for each relay on the channel).
CONFIGURATIONS \ BAUD RATE
: Set from 300 to 115k baud
CONFIGURATIONS \ PARITY
: Set to none, even or odd, depending on configuration
CONFIGURATIONS \ TURNAROUND
: Enter the minimum Modbus turnaround time, 0 to 1000 ms
9.1.4 EXECUTE OPERATION COMMAND CODES (COIL NUMBERS)
The following table lists the coil numbers, which may be used in the Modbus "force coil" command.
Table 9–1: EXECUTE OPERATION CODES
COIL NUMBER FUNCTION
0001h
Simulate a keypad reset (i.e., reset a trip after the condition has cleared)
0101h
Force the FAR into the energized state
0111h
Force the FAR into the de-energized state
0121h
Un-force the FAR, reverting it to program control
0102h
Force the FCX relay into the energized state
0112h
Force the FCX relay into the de-energized state
0122h
Un-force the FCX relay, reverting it to program control
0103h
Force the TRP relay into the energized state
0113h
Force the TRP relay into the de-energized state
0123h
Un-force the TRP relay, reverting it to program control
Summary of Contents for SPM Series
Page 2: ......
Page 4: ......
Page 10: ...vi SPM Synchronous Motor Protection Control GE Power Management TABLE OF CONTENTS...
Page 74: ...6 4 SPM Synchronous Motor Protection Control GE Power Management 6 2 STATUS 6 ACTUAL VALUES 6...
Page 120: ...C 2 SPM Synchronous Motor Protection Control GE Power Management C 1 WARRANTY APPENDIXC C...
Page 124: ...iv SPM Synchronous Motor Protection Control GE Power Management INDEX...
Page 125: ...GE Power Management SPM Synchronous Motor Protection Control NOTES...