2.
RECOMMENDED PLANNED MAINTENANCE
To ensure safe and effective operation of the equipment, planned maintenance procedures should be
carried out at the intervals specified.
2-1
Planned maintenance performed by the Radiologic Technologist
This consists of simple Quality Control (QC) tests which ensure that the system is operating to its
design standards.
Frequency: from daily to semi-annually, depending on the task.
Procedures: please refer to the Senographe 2000 D QC Manual.
2-2
Planned maintenance performed by the Medical Physicist
This consists of QC tests performed by the Medical Physicist to ensure that the system provides a
high level of mammographic quality.
Frequency: annually.
Procedures: please refer to the Senographe 2000 D QC Manual.
2-3
Planned maintenance performed by the Field Service Engineer
Planned maintenance (PM) should be performed twice a year by a GEMS Service Representative or
similarly qualified and trained personnel.
A complete day is necessary on each occasion. The procedures and their frequency are listed below.
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Task
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
Interval (months)
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
On–site preliminary:
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Analyze system logs
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
6
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Acquisition Backup
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Inspection and functional checks:
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check Emergency Stop Buttons
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check Cable Grounding
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
24
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Inspect Radiation Shield
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
24
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check power–Off/On Sequences
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Generator checks and calibration:
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check Generator Calibration
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check HV unit
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check the Half–Value layer Measurement
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check kVp settings
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Check mA and mAs settings
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Change Generator CPU battery
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
36
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓÓ
Clean Conditioner air filter
ÓÓÓÓÓÓÓ
ÓÓÓÓÓÓÓ
12
FOR
TRAINING
PURPOSES
ONLY!
NOTE:
Once
downloaded,
this
document
is
UNCONTROLLED,
and
therefore
may
not
be
the
latest
revision.
Always
confirm
revision
status
against
a
validated
source
(ie
CDL).