LPS-D Line Protection System
GE Power Management
10.3 FILE MENU
10 ALPS TEST PROGRAM
10
10.3.4 CLOSE TEST FILE
Save the currently active test file. Select Close Test File from the File menu. Window is cleared from the
screen thus closing the test.
Modify the currently active test file. Select Close Test File from the File menu. A message box will be dis-
played asking if you want to save the file. Click the OK button. The file is saved under the current name. The
window is cleared from the screen thus closing the test.
•
Verify that the file contains the modified values by looking at the file with a text editor.
Modify the currently active test file. Select Close Test File from the File menu. A message box will be dis-
played asking if you want to save the file. Click the Cancel button. The file is not closed.
Verify the window is not cleared from the screen and that the test file contains the modified inputs.
Modify the currently active test file. Select Close Test File from the File menu. A message box will be dis-
played asking if you want to save the file. Click the No button. The file is not saved. The window is cleared from
the screen thus closing the test.
•
Verify that the file does not contain the modified values by looking at the file with a text editor.
Open a new test file. Select Close Test File from the File menu. A message box will be displayed asking if you
want to save the file. Click the OK button. The Save Input Quantities As dialog box will be displayed. Enter a
name for the test and select the OK button. The test is saved. The window is cleared from the screen thus clos-
ing the test.
•
Verify that the file contains the values displayed in the test dialog boxes with a text editor.
10.3.5 SAVE INPUT QUANTITIES
Select a test where the input quantities have been changed and not saved. Select Save Input Quantities from
the File menu. The test is saved.
Verify the file format:
•
Read the file using any text editor. The saved file is in ASCII format.
•
There is a line for each input quantity listed in Table 1 regardless of whether a particular input quantity was
used for the test.
•
Each line contains the value’s ID number, the value, and a brief description of the quantity. Each item on
the line is separated by spaces.
•
There is one section for each test.
Verify file can be re-opened:
•
Close the test file that was just saved.
•
Open the saved test file.
•
Select the menu item for the test.
•
Verify that the quantities in the dialog box are the same as in the test just saved.
Create a new test. Select Save Input Quantities from the “File” menu. The Save Input Quantities As dialog
box will be displayed. Enter a name for the test and select the OK button. The test is saved.
Verify the saved test as above.
Summary of Contents for LPS-D
Page 2: ......
Page 4: ......
Page 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Page 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Page 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Page 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Page 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Page 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...