4-
10
LPS-D Line Protection System
GE Power Management
4.2 GENERAL RELAY TESTS
4 ACCEPTANCE/PERIODIC TESTS
4
7.
After the output is tested, scroll to the next output to test, then press the ENT key. This output closes and
the previously selected output opens. Continue in this fashion until all outputs are tested.
8.
End the test mode by scrolling to the
END TEST MODE
selection, then press the ENT key. Alternatively, press END followed by the ENT key to end the test and re-
enable protection.
Table 4–2: DIGITAL OUTPUTS TEST CONNECTIONS
DIGITAL
OUPTUT
X
Y
DIGITAL
OUTPUT
X
Y
T1
A3
A19
A12
B4
B20
T2
A4
A20
KT1 (no)
B5
B21
T3
A5
A21
KT1 (nc)
B5
B22
T4
A6
A22
KT2 (no)
B5
B21
T5
A7
A23
KT2 (nc)
B23
B7
T6
A8
A24
KT3 (no)
B8
B24
A1
A9
A25
KT3 (nc)
B8
B25
A2
A10
A26
KT4 (no)
B26
B9
A3
A11
A27
KT4 (nc)
B26
B10
A4
A12
A28
C1A (no)
B11
B27
A5
A13
A29
C1B (nc)
B11
B28
A6
A14
A30
C2A (no)
B29
B12
A7
A15
A31
C2B (nc)
B29
B13
A8
A16
A32
CA (nc)
B14
B30
A9
B1
B17
CA (no)
B14
B31
A10
B2
B18
PWR (nc)
B32
B15
A11
B3
B19
PWR (no)
B32
B16
Tx - TRIPPING contacts (programmable)
Ax - Alarm contacts (programmable)
KTx - Key Transmitter contacts (programmable)
Cxy - C Form contacts with one NO/NC contact pair (programmable)
CA - Critical Alarm
PWR - Power Supply Alarm
†
These digital outputs apply to the Single Phase Tripping model only.
Summary of Contents for LPS-D
Page 2: ......
Page 4: ......
Page 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Page 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Page 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Page 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Page 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Page 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...