2.3 PROTECTION SETTINGS
2 CALCULATION OF SETTINGS
2
1822: SYNCPHASE - Voltage used by SYNCHECK
SYNCPHASE can be set to VA, VB, VC, VAB, VBC or VCA and establishes which phase or phase-pair bus
and line voltage is to be used by the synchronism check function. Select a setting that matches the synchroism
check voltage input to the relay system.
1823: SYNCHOLD - SYNCHECK Hold Time
SYNCHOLD sets the time that the recloser will wait for a synchronism check input to be applied. If the sync
check input is not applied during this time, the recloser will go to lockout when the time delay ends. The range
of the SYNCHOLD time setting is 1 to 100 seconds. Make a setting that is suitable to the application.
1824: SP1PDELAY2 - Supervise Second Reclose
SP1PDELAY2 can be set to YES or NO and establishes whether the first three-pole reclose (if selected) fol-
lowing an initial single-pole trip will be supervised by the synchronism check function.
1825: SP1PDELAY3 - Supervise Third Reclose
SP1PDELAY3 can be set to YES or NO and establishes whether the second three-pole reclose (if selected)
following an initial single-pole trip will be supervised by the synchronism check function.
1826: SP1PDELAY4 - Supervise Fourth Reclose
SP1PDELAY4 can be set to YES or NO and establishes whether the third three-pole reclose (if selected) fol-
lowing an initial single-pole trip will be supervised by the synchronism check function.
1827: SP3PDELAY1 - Supervise First Three-pole Reclose
SP3PDELAY1 can be set to YES or NO and establishes whether the first three-pole reclose (if selected) fol-
lowing an initial three-pole trip will be supervised by the synchronism check function.
1828: SP3PDELAY2 - Supervise Second Three-pole Reclose
SP3PDELAY2 can be set to YES or NO and establishes whether the second three-pole reclose (if selected)
following an initial three-pole trip will be supervised by the synchronism check function.
1829: SP3PDELAY3 - Supervise Third Three-pole Reclose
SP3PDELAY3 can be set to YES or NO and establishes whether the third three-pole reclose (if selected) fol-
lowing an initial three-pole trip will be supervised by the synchronism check function.
1830: SP3PDELAY4 - Supervise Fourth Three-pole Reclose
SP3PDELAY4 can be set to YES or NO and establishes whether the fourth three-pole reclose (if selected) fol-
lowing an initial three-pole trip will be supervised by the synchronism check function.
1831: SYNCMANCLS - Supervise Manual Close
SYNCMANCLS can be set to YES or NO and establishes whether manual closing of the breaker will be super-
vised by the synchronism check function.
1832: VBUSLIVE - Live Bus Voltage
VBUSLIVE establishes the voltage at which the bus voltage must be greater than before the synchronism
check function and the functions requiring live bus supervision are allowed to operate. The voltage level can be
set over a range of 0.1 to 130.0 V.
Summary of Contents for LPS-D
Page 2: ......
Page 4: ......
Page 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Page 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Page 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Page 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Page 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Page 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...