
viii
LPS-D Line Protection System
GE Power Management
TABLE
OF
CONTENTS
4.2.3
T2 – DIGITAL OUTPUT TEST ................................................................... 4-9
4.2.4
T3 – CONFIGURABLE INPUT AND OUTPUT TEST .............................. 4-11
a TEST T3 PROCEDURE........................................................................... 4-11
4.2.5
T4 – AC SYSTEM INPUT TEST .............................................................. 4-12
5. FUNCTIONAL TESTS
(FACTORY SETTINGS)
5.1 TEST SUMMARY
5.1.1
DESCRIPTION .......................................................................................... 5-1
a MEASURING UNIT TESTS ....................................................................... 5-1
b ZONE REACH AND TIMER TESTS .......................................................... 5-1
c PHASE-TO-PHASE ZONE REACH TESTING .......................................... 5-1
5.2 MEASURING UNIT TESTS
5.2.1
T1 – FAULT DETECTOR TEST ................................................................ 5-2
5.2.2
T2 – IT TRIP SUPERVISION TEST........................................................... 5-3
5.2.3
T3 – IB BLOCKING SUPERVISION TEST ................................................ 5-3
5.2.4
T4 – GROUND DIRECTIONAL TRIP TEST, IPT + NT.............................. 5-4
5.2.5
T5 – GROUND DIRECTIONAL BLOCK TEST, IPB + NB ......................... 5-4
5.2.6
T6 – PHASE INSTANTANEOUS OVERCURRENT 50 ............................. 5-5
5.2.7
T7 – GROUND INSTANTANEOUS OVERCURRENT 50G....................... 5-5
5.2.8
T8 – GROUND TIME OVERCURRENT 51G............................................. 5-6
5.2.9
T9 – UNDERVOLTAGE TEST ................................................................... 5-9
5.2.10 T10 – OVERVOLTAGE TEST ................................................................... 5-9
5.3 ZONE REACH AND TIMER TESTS
5.3.1
GENERAL ZONE REACH TESTING CONSIDERATIONS ..................... 5-10
5.3.2
T11 – ZONE 1 GROUND REACH, M1G GROUND FAULTS.................. 5-11
5.3.3
T12 – ZONE 2 GROUND REACH, MTG GROUND FAULTS ................. 5-12
5.3.4
T13 – ZONE 3 GROUND REACH, M3G GROUND FAULTS.................. 5-13
5.3.5
T14 - ZONE 4 GROUND REACH, M4G GROUND FAULTS .................. 5-14
5.3.6
T15 – GROUND (ZONE BACKUP) TIMER TESTS ................................. 5-15
a ZONE 2 TIMER ........................................................................................ 5-15
b ZONE3 TIMER ......................................................................................... 5-16
c ZONE4 TIMER ......................................................................................... 5-16
5.4 PHASE-TO-PHASE ZONE REACH TESTING
5.4.1
T16 – ZONE 1 PHASE REACH, M1 FAULTS ......................................... 5-17
5.4.2
T17 – ZONE 2 PHASE REACH, M2 FAULTS ......................................... 5-18
5.4.3
T18 – ZONE 3 PHASE REACH, M3 FAULTS ......................................... 5-19
5.4.4
T19 – ZONE 4 PHASE REACH, M4 FAULTS ......................................... 5-20
5.4.5
T20 – PHASE (ZONE BACK-UP) TIMER TESTS ................................... 5-21
a ZONE2 TIMER ......................................................................................... 5-21
b ZONE3 TIMER ......................................................................................... 5-22
c ZONE4 TIMER ......................................................................................... 5-22
5.5 MOB TESTING
5.5.1
T21 – OUT-OF-STEP REACH, MOB....................................................... 5-24
5.5.2
ENDING FUNCTIONAL TESTS .............................................................. 5-24
6. FUNCTIONAL TESTS
(USER SETTINGS)
6.1 LPS-D FUNCTIONAL TESTS
6.1.1
DESCRIPTION .......................................................................................... 6-1
a GENERAL TESTS ..................................................................................... 6-1
b MEASURING UNIT TESTS ....................................................................... 6-1
c BACKUP PROTECTION TESTS ............................................................... 6-1
d ZONE GROUND / PHASE REACH MEASURING UNITS......................... 6-1
6.1.2
DRAWINGS AND REFERENCES ............................................................. 6-2
a DRAWINGS ............................................................................................... 6-2
b REFERENCE ............................................................................................. 6-2
Summary of Contents for LPS-D
Page 2: ......
Page 4: ......
Page 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Page 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Page 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Page 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Page 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Page 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...