
GE Power Management
LPS-D Line Protection System
C-
13
APPENDIX C
C.3 POINT LISTS
C
C.3.3 BINARY OUTPUT, CONTROL RELAY OUTPUT BLOCK
The LPS-D uses the following rules when parsing requests for control of Binary Output points using Object 12.
1.
The Count field is checked first. If it is zero, the command will be accepted but no action will be taken. If
this field is non-zero, the command will be executed once.
2.
The Control Code field of Object 12 is then checked:
•
The Queue and Clear sub-field are ignored.
•
For all points, the only valid control is “Close – Pulse On” (0x41). This is used to initiate the function
associated with the point.
•
Any value in the Control Code field not specified above is invalid and will be rejected.
3.
The On Time and Off Time fields are ignored. A “Pulse On” control takes effect immediately when received.
Thus, the timing is irrelevant.
4.
The Status field in the response will reflect the success or failure of the control attempt as below:
•
A Status of “Request Accepted” (0) will be returned if the command was accepted.
•
A Status of “Request Not Accepted due to Formatting Errors” (3) will be returned if the Control Code
field was incorrectly formatted or an invalid code was present in the command.
•
A Status of “Control Operation not Supported for this Point” (4) will be returned if an attempt was
made to operate the point and the device, owing to its configuration, does not allow the point to per-
form its function.
Table C–4: POINT LIST: OBJECTS 10 & 12
BINARY OUTPUT (OBJECT 10)
CONTROL RELAY OUTPUT BLOCK (OBJECT 12)
INDEX
DESCRIPTION
0
Open Breaker #1
1
Close Breaker #1
2
Open Breaker #2
3
Close Breaker #2
4
Enable Outputs
5
Disable Outputs
6
Trigger Oscillography
7
Reset Recloser
8
Lockout Recloser
9
Reset Event Data
10
Reset Fault Data
11
Reset OST Data
12
Reset Breaker Duty
13
Reset Latched Alarms
14
Start Settings Change
15
End Settings Change
16
Summary of Contents for LPS-D
Page 2: ......
Page 4: ......
Page 226: ...7 4 LPS D Line Protection System GE Power Management 7 1 RATINGS 7 SPECIFICATIONS 7 ...
Page 284: ...10 20 LPS D Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Page 412: ...C 34 LPS D Line Protection System GE Power Management C 3 POINT LISTS APPENDIXC C ...
Page 416: ...D 4 LPS D Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Page 422: ...F 2 LPS D Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Page 436: ...xiv LPS D Line Protection System GE Power Management INDEX INDEX ...