7
7 S
So
offttw
wa
arre
e O
Ovve
errvviie
ew
w
7.1.1 Two GUI Modes .................................................................................................................69
7.1.2 Production Mode ................................................................................................................70
7.1.2.1 Production Mode Login..............................................................................................71
7.1.2.2 Production Mode Logout............................................................................................71
7.1.2.3 Production Mode Alarm Types ...................................................................................72
7.1.2.4 Chamber Light ..........................................................................................................73
7.1.2.5 Manual Controls........................................................................................................74
7.1.2.5.1 Build Tank.......................................................................................................75
7.1.2.5.2 Chamber Door ................................................................................................75
7.1.2.5.3 Fetch Powder Continuous Mode .......................................................................76
7.1.2.5.4 Vacuum Cleaner..............................................................................................76
7.1.2.5.5 Rake Movement ..............................................................................................77
7.1.2.5.6 Table Movement..............................................................................................78
7.1.2.5.7 Adjust The Step Size In Production Mode ..........................................................80
7.1.2.6.1 Start A Build In Production Mode ......................................................................82
7.1.2.6.2 Import A Build Project In Production Mode.........................................................84
7.1.2.7 Building ....................................................................................................................85
7.1.2.8 Ventilation Controls ...................................................................................................86
7.1.2.9.1 Activate Powder Protection In Production Mode .................................................89
7.1.2.9.2 Run Auto Beam Calibration In Production Mode.................................................90
7.1.2.9.3 Change Cathode Burn Time In Production Mode ...............................................91
7.1.2.9.4 Chamber Controls In Production Mode..............................................................92
7.1.2.9.5 Reset Maintenance Timers In Production Mode .................................................93
7.1.3.3.1.1 Save A Build Project ...................................................................... 104
7.1.3.3.1.2 Import A Build Project .................................................................... 105
7.1.3.3.1.3 Import A Build File ......................................................................... 106
7.1.3.3.1.4 Export A Build Project .................................................................... 106
7.1.3.3.2 Perform A System Outgassing........................................................................ 107
7.1.3.3.3 Start And Stop Levels .................................................................................... 109
7.1.3.5 Check The Process Themes .................................................................................... 112
7.1.3.6 Process Settings..................................................................................................... 113
7.1.3.7 Hardware Setup...................................................................................................... 114
7.1.3.7.1 Functions...................................................................................................... 114
7.1.3.7.2 Zero The Burn Time....................................................................................... 117
7.1.3.7.3 Powder Dispatcher ........................................................................................ 118
7.1.3.7.4 Vacuum ........................................................................................................ 121
7.1.3.7.5 Start The Vacuum Sequence.......................................................................... 122
7.1.3.7.6 Start The Powder Protection........................................................................... 123
7.1.3.7.7 Close The Chamber Door............................................................................... 124
7.1.3.7.8 Open The Chamber Door ............................................................................... 125
7.1.3.7.9 Power Supply................................................................................................ 126
7.1.3.8 Align Beam............................................................................................................. 127
7.1.3.9 Manual Beam Alignment.......................................................................................... 128
7.1.3.10 Manual Controls.................................................................................................... 130
7.1.3.11 Simulator.............................................................................................................. 131
02
OM-710430
en-GB
67
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 02 OM 710430 en GB O OM M Operation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 02 OM 710430 en GB...
Page 24: ...5 Safety 412532 Jokab Safety Eden Eva 105261 Light curtain 20 02 OM 710430 en GB...