7
Software
12. Press S
Stta
arrtt to enable the Power Supply (high volt-
age unit).
The high voltage and cathode current will be
ramped up to operational levels.
13. Wait for the indicator to turn green.
N
No
otte
e
All status indicators (located in the upper right panel) for all tabs must be green to be able to start
the machine.
14. Press S
Stta
arrtt to enable the build.
The start process dialogue appears. Start plate
heating is preselected and necessary when starting
a new build.
15. Press the G
Grre
ee
en
n ttiicckk to accept the start plate
heating.
16. After the system outgassing, remove the start plate
and cathode and put these aside for a possible fu-
ture use.
108
02
OM-710430
en-GB
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 02 OM 710430 en GB O OM M Operation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 02 OM 710430 en GB...
Page 24: ...5 Safety 412532 Jokab Safety Eden Eva 105261 Light curtain 20 02 OM 710430 en GB...