Before a build, it is advised to run a simulation of the build in EBM Control.
This could be done on the machine computer or a workstation.
There are two types of simulations:
S
Stta
an
nd
da
arrd
d S
Siim
mu
ulla
attiio
on
n
The standard simulation will go through the build layer by layer and per-
form all the calculation that will be done during the actual build.
The simulation allows you to verify that the job will be successfully ana-
lysed during the build.
T
Tiim
me
e A
Ap
pp
prro
oxxiim
ma
attiio
on
n
The time approximation only performs the calculations for a limited amount
of layers and extrapolates the values for the remaining layers.
This type of simulation is only intended to quickly give a rough estimate of
the build time for the chosen build. It will n
no
ott detect any flaws in the build.
02
OM-710430
en-GB
131
Summary of Contents for ArcamEBM Spectra H
Page 1: ...Original language 02 OM 710430 en GB O OM M Operation Manual Spectra H...
Page 2: ...This page is intentionally left blank...
Page 4: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 6: ...Table of contents ii 02 OM 710430 en GB This page is intentionally left blank...
Page 8: ...This page is intentionally left blank 2 Revision Notes 4 02 OM 710430 en GB...
Page 24: ...5 Safety 412532 Jokab Safety Eden Eva 105261 Light curtain 20 02 OM 710430 en GB...