G1000/GFC 700 Post Installation Checkout Procedure – Hawker / Beechcraft King Air C90
Page 5-9
190-00682-00
Revision 5
The 3
rd
item on the checklist instructs the operator to “prepare a detailed test sequence
with precise start and stop times for exercising all electronic devices”. The list of relevant
electronic devices are given in Table 5-1. Begin test with flaps retracted, flight controls in
a neutral position, all lights selected OFF.
Table 5-1. Magnetometer Interference Test Sequence
Elapsed Time
since Start of
Test (min:secs)
Action
0:00 Test
begins
0:10
Navigation lights on
0:20
Navigation lights off
0:30
Landing lights on
0:40
Landing lights off
0:50
Taxi lights on
1:00
Taxi lights off
1:20 Strobes
on
1:40 Strobes
off
1:50
Recognition lights on
2:00
Recognition lights off
2:10 Beacon
on
2:20 Beacon
off
2:30
Rudder full left
2:40
Rudder full right
2:50
Elevator full nose UP
3:00
Elevator full nose DN
3:10
End of test
6. When
the
CALIBRATE
field is blinking, press the ENT key to begin the procedure, and have a
stopwatch ready to begin recording the elapsed time.
It is important that the “time equals zero” moment corresponds with the moment PFD1
first displays the blinking TEST COMPLETE? message.
7. The operator should carry out the actions called for in the prepared test sequence.
NOTE
NOTE