Page 2-22
G1000/GFC 700 Post Installation Checkout Procedure - Hawker / Beechcraft King Air C90
Revision 5
190-00682-00
2.17.1
System Communication Hierarchy
The following criteria must be satisfied to be able to perform the desired operation:
Desired Operation
Criteria for Success
Load Software to MFD or PFD Displays
•
G1000/C90 SW Loader Card must be inserted
in top slot for each display to be loaded.
•
CLR & ENT keys must be held during power
up of display.
•
Power on only one display at a time during
software loading.
Load AIRFRAME, SYSTEM, MFD1, PFD1, PFD2
and MANIFEST configuration files to MFD and
PFDs
•
G1000/C90 SW Loader Card must be inserted
in top slot of PFD1.
•
PFD1 and MFD must be powered on.
•
PFD1 and MFD must have correct software.
Load Software/Configuration files to GIA 63Ws
•
G1000/C90 SW Loader Card must be inserted
in top slot of PFD1.
•
G1000 system must be powered on.
•
PFD and MFD must have correct software.
•
PFD1 and MFD must be successfully
configured with AIRFRAME, SYSTEM,
MANIFEST, MFD1, PFD1 and PFD2
configuration files.
Load Software/Configuration files to:
- GMA 1347D
- GDC 74B
- GEA 71
- GRS 77 (software only)
- GMU 44 (software only)
- GTX 33
•
G1000/C90 SW Loader Card must be inserted
into PFD1 top slot.
•
G1000 must be powered on.
•
PFD1 and MFD must have correct software
and configuration settings.
•
GIA 63Ws must have correct software.
•
GIA 63Ws must be successfully configured
with GIA1 and GIA2 configuration files.
•
Data path from GIA1 to each LRU must be
operational.