Page 3-10
G1000/GFC 700 Post Installation Checkout Procedure - Hawker / Beechcraft King Air C90
Revision 5
190-00682-00
3.3
Display Testing
The G1000 system is tested while operating in the normal mode unless otherwise specified. If the system
is in configuration mode, restart the displays by cycling the PFD1, PFD2 and MFD circuit breakers to
start the display in the normal mode.
1. Apply aircraft power. Observe the MFD power-up screen. Verify the display is formatted as shown
below in Figure 3-1. Figure 3-1 is a format reference, the illustration on the left may vary. Note
database versions and system software represented in the upper right corner. Refer to General
Arrangement Drawing 005-00375-22 drawing for the correct database and system software versions.
Figure 3-1. MFD Power Up Page (format reference)
2. The ‘System’ number reflected in the upper right hand corner is the System Software Version. It
correlates to the G1000 SW Loader Card used to load the software to the system. For example:
EXAMPLE:
System Software Version ‘
0xxx.xx
’ = Loader Card P/N 010-0
0xxx-xx
3. Verify that the System Software Version is correct per General Arrangement Drawing 005-00375-22.
4. Press the GCU
ENT
key to acknowledge the agreement on the MFD (NOTE: The rightmost softkey
may also be used to acknowledge the agreement).