Page 2-10
G1000/GFC 700 Post Installation Checkout Procedure - Hawker / Beechcraft King Air C90
Revision 5
190-00682-00
2.5.5.3
Airspeed Configuration Load Confirmation
1. Deselect cursor if selected, use the large FMS knob to select the GDU page group and the small
FMS knob to select “AIRFRAME CONFIGURATION” page.
2. Verify the correct airspeed configuration, as loaded in step 2.5.5, is displayed in the “AIRSPEED”
window.
Aircraft LJ-1063 through LJ-1137, and LJ-1146: Vyse = 107 kts, Vmca = 90 kts , Vs
1
= 89 kts