Revision 5
155
August 2021
Testing, 152
Digital Outputs.
See
Relay Outputs
Direct Connect, 75
Display Board, 17
Drawing Page (Web Based GUI), 102
Drawings
AC Wiring Schematic, 141
DC Signals and Wiring Diagram, 142
Flow Diagram, 143
Mounting and Service Connections, 136
Oven Cabinet Door Removed, 137
Power, Steam, Air, Signals Connection Details, 140
E
Electronic Power Control Unit, 34, 37
Bypass, 37
Enron
Modbus Format, 97
EPCU.
See
Electronic Power Control Unit
Ethernet Port, 17
Configuration Settings, 74
Local Connection.
See
Direct Connect
Remote Connection.
See
Network
F
Factory Parameters
Page (Web Based GUI),
99
Available Parameters, 100
Factory Reference, 63
Factory Section, 99
Fault Condition, 17, 46, 59
Description of Each Type, 60, 85
Fibre Optic Cables, 14, 108
Installation, 26
SMA Connector,
115
Testing,
115
Testing / Replacment Procedure,
115
Filter Points, 92
First Vector Pixel, 62, 100
First Vector Pixel Level, 87
Fixed Pressure, 70, 93
Fixed Temperature, 70, 93
H
Hazardous Area Certification, 20
Help Section, 102
High Cabinet Temperature Alarm, 92
High Cell Temperature Alarm, 92
High Probe Temperature Alarm, 92
High S
8
Fault
Setpoint, 74
High S
8
Warn
Setpoint, 74
High SVAP Alarm, 92
High SVAP Warning, 92
I
Indicators
Page (Web Based GUI), 84
Indicators
Panel, 58
Ingress Protection (IP) Rating, 20
Installation Procedure, 21
Instrument Air, 20
Clearing Sample Handling System / Probe
Blockages, 43
Flow Control Settings, 39
Pressure and Flow Requirements, 20
Pressure Regulator, 45
Supply Connection, 33
Integration Period, 62, 93
Automatic Optimization Procedure,
111
Manual Optimization Procedure,
111
Optimization, 62, 87
Integration Time.
See
Integration Period,
See
Integration Period
IO Board, 17, 32, 151
Web Based GUI.
See
IO Board Web GUI
IO Board Web GUI, 147
Direct Peripheral Board Control, 148, 150
Manual Override
Page, 149
Peripheral Board
Menu, 147
Status
Page, 148
IP Port Number, 95
K
Keypad, 15, 50
Key Functions, 50
L
Little Endian, 95
Local Display, 49
Absorbance
panel.
See
Absorbance
Panel
Analysis 1 Panel.
See
Analysis 1 Panel
Analysis 2
panel.
See
Analysis 2
Panel
Config
panel.
See
Configuration
Panel
Indicators
panel.
See
Indicators
Panel
Spectrum
panel.
See
Spectrum
Panel
User Interface, 49
Low Cabinet Temperature Alarm, 92
Low Cell
Alarm Setpoint, 74
Low Cell Temperature Alarm, 92
Low Probe
Alarm Setpoint, 74
Low Probe Temperature Alarm, 92
M
Maintenance Check Out Procedure, 105
Manual Zero, 54, 81
Manufacturer’s Warranty, 12
Summary of Contents for 943-TGS-CE
Page 137: ...Revision 5 137 August 2021 Figure 84 Oven Cabinet Details...
Page 138: ...Revision 5 138 August 2021 Figure 85 Control Cabinet Door Closed...
Page 139: ...Revision 5 139 August 2021 Figure 86 Control Cabinet Door Removed...
Page 140: ...Revision 5 140 August 2021 Figure 87 Power Steam Air Signals Connection Details...
Page 141: ...Revision 5 141 August 2021 Figure 88 AC Wiring Schematic...
Page 142: ...Revision 5 142 August 2021 Figure 89 DC Signals and Wiring Diagram...
Page 143: ...Revision 5 143 August 2021 Figure 90 Flow Diagram...
Page 144: ...Revision 5 144 August 2021 Figure 91 Control and Oven Cabinets Interconnect Wiring...