Revision 5
121
August 2021
Figure 76: UV Lamp Enclosure Internal Layout
6. Remove the two plastic hole plugs from the top of the UV Lamp Enclosure to gain
access to the lamp retaining screws. The location of these two hole plugs is indicated
in Figure 76 by the red circle (#1).
7. Disconnect the three (3) lamp connection wires from the terminal strip, circled in yellow
in Figure 76 (#2).
8. Remove the two lamp retaining screws (5-40 x 3/8") from the lamp retaining ring using
a 3/32" ball driver passed through the removed hole plugs. The location of the front
retraining screw is marked by the blue circle (#3) in Figure 76.
9. Remove the lamp.
10. Place the new lamp in the lamp retainer on the lamp mount assembly. Ensure the lamp
is facing the correct direction. Refer to Figure 77 for the correct UV source lamp
orientation.
Figure 77: UV Lamp Orientation
1
2
3
This side faces
towards the
anti-solarant
fluid holder.
Summary of Contents for 943-TGS-CE
Page 137: ...Revision 5 137 August 2021 Figure 84 Oven Cabinet Details...
Page 138: ...Revision 5 138 August 2021 Figure 85 Control Cabinet Door Closed...
Page 139: ...Revision 5 139 August 2021 Figure 86 Control Cabinet Door Removed...
Page 140: ...Revision 5 140 August 2021 Figure 87 Power Steam Air Signals Connection Details...
Page 141: ...Revision 5 141 August 2021 Figure 88 AC Wiring Schematic...
Page 142: ...Revision 5 142 August 2021 Figure 89 DC Signals and Wiring Diagram...
Page 143: ...Revision 5 143 August 2021 Figure 90 Flow Diagram...
Page 144: ...Revision 5 144 August 2021 Figure 91 Control and Oven Cabinets Interconnect Wiring...