Prior to carrying out spectrometer signal optimization, the analyzer MUST be in back
purge and offline mode.
6.4.1 Automated Optimization
1. Place the analyzer in back purge mode. This can be done by selecting the
Back Purge
field on the
Analysis 1
panel and pressing the
↵
key
to place an
X
in the box OR by
pressing the F6 key on the keypad.
2. Access the
Spectrum
panel, navigate to the
Optimize Integ Time
button and press
↵
. Make sure that the peak height
after completion of this operation is ≈
28000 A/D
counts.
3. Return to the
Analysis 1
Panel.
4. Request a Manual Zero by navigating to the
Manual Zero
button and pressing
↵
.
5. After the Manual Zero is completed, place the analyzer back in Sampling mode by
selecting the
Sample
field and then pressing
↵
to put an x in the box OR pressing F6
n the analyzer keypad.
6. Place the analyzer back into ONLINE mode by toggling the button on the
Analysis 2
panel.
6.4.2 Manual Optimization
1. Place the analyzer in back purge mode. This can be done by selecting the
Back Purge
field on the
Analysis 1
panel and pressing the
↵
key
to place an
X
in the box OR by
pressing the F6 key on the keypad.
2. Access the
Spectrum
panel.
3. If the peak level is between 25,000 and 28,000 then no adjustment is required at this
time.
4. If adjustment is necessary, optimize the peak signal height to
≈28
,000 counts. Navigate
to the
Set Integ. TIme
and press
↵
to display the Integration Period dialog box (Figure
34, Section 4.6). Enter a new integration period in the
New Value
field and press
↵
.
After several seconds, the new raw signal will be displayed. New values for the
Integration Period can be entered until the peak height is 28 000 /- 1000
counts.
5. Once the peak height has been optimized, record the peak height value and the
resulting integration period.
7. Return to the
Analysis 1
Panel.
8. Request a Manual Zero by navigating to the
Manual Zero
button and pressing
↵
.
Summary of Contents for 943-TGS-CE
Page 137: ...Revision 5 137 August 2021 Figure 84 Oven Cabinet Details...
Page 138: ...Revision 5 138 August 2021 Figure 85 Control Cabinet Door Closed...
Page 139: ...Revision 5 139 August 2021 Figure 86 Control Cabinet Door Removed...
Page 140: ...Revision 5 140 August 2021 Figure 87 Power Steam Air Signals Connection Details...
Page 141: ...Revision 5 141 August 2021 Figure 88 AC Wiring Schematic...
Page 142: ...Revision 5 142 August 2021 Figure 89 DC Signals and Wiring Diagram...
Page 143: ...Revision 5 143 August 2021 Figure 90 Flow Diagram...
Page 144: ...Revision 5 144 August 2021 Figure 91 Control and Oven Cabinets Interconnect Wiring...