SAFETY
SAFETY MAINTENANCE INFORMATION
2-35
SAFETY MAINTENANCE INFORMATION
2
WARNING TAG
q
Always attach the "DO NOT OPERATE" warning tag to the
work equipment control lever in the operator's cab to alert
others that you are performing service or maintenance on the
machine.
Attach additional warning tags around the machine if neces-
sary.
Warning tag Part No. 09963-03000
Keep this warning tag in the tool box while it is not used. If there is
not the tool box, keep the tag in the operation manual pocket.
q
If others start the engine, or touch or operate the work equip-
ment control lever while you are performing service or main-
tenance, you could suffer serious injury or property damage.
KEEP WORK PLACE CLEAN AND TIDY
q
Do not leave hammers or other tools lying around in the work place. Wipe up all grease, oil, or other sub-
stances that will cause you to slip. Always keep the work place clean and tidy to enable you to carry out oper-
ations safely.
If the work place is not kept clean and tidy, there is the danger that you will trip, slip, or fall over and injure your-
self.
q
When cleaning the ceiling window which is made of organic glass (polycarbonate), use tap water and avoid
use of organic solvents for cleaning. An organic solvent like benzene, toluene or methanol can invite a chemi-
cal reaction like dissolution and decomposition on the window glass, deteriorating polycarbonate in use.
APPOINT LEADER WHEN WORKING WITH OTHERS
q
When repairing the machine or when removing and installing the work equipment, appoint a leader and follow
his instructions during the operation.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......