OPERATION
MACHINE OPERATIONS AND CONTROLS
3-81
Check working Lamp switch
Turn the lamp switch to the ON position and check that the work-
ing lamp light up.
If the lamps do not light up, there is probably a broken bulb or dis-
connection in the wiring, so contact your Komatsu distributor for
repairs.
Check electrical wiring
CAUTION
If fuses are frequently blown or if there are traces of short-circuiting on the electrical wiring, promptly ask
your Komatsu distributor to locate the cause and make the repair.
Keep the top surface of the battery clean and check the breather hole in the battery cap. If it is clogged
with dirt or dust, wash the battery cap to clear the breather hole.
Check that there is no damage to the fuse, that a fuse of the specified capacity is being used, that there are no
signs of any disconnection, breakage, or short circuit in the electric wiring, check for any loose terminals, and
tighten any loose terminals that are found.
Be particularly careful to check the wiring for the battery, starting motor, and alternator.
In addition, if any flammable material is accumulated around the battery, remove it.
For repairs or investigation of the cause, please contact your Komatsu distributor.
Check Function Of Horn
1. Turn the starting switch to the ON position.
2. Confirm that the horn sounds immediately when the horn button is pressed.
If the horn does not sound, please contact your Komatsu distributor for repair.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......