TRANSPORTATION
OPERATION
3-132
PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE
3
WARNING
Never use the machine for operations with the track frame retracted.
Reducing Track Gauge
1. Remove center frame mounting bolts (1). (one side, front +
rear: 16 bolts)
2. Swing the upper structure so that it is at 90
°
on the side of
track frame (A) to be retracted, then use the work equipment
to jack up the track frame.
3. Set blocks (B) (20 to 30 cm (8 to 12 in) wooden blocks)
towards the outside of track frame (A), then use the boom cyl-
inder to lower the machine slowly. The track frame (A) will
slide and stop when it contacts the stopper.
4. Lower the machine carefully and install bolts (2). (one side,
front + rear: 8 bolts out of bolts (1))
5. Tightening torque: 1960 - 2450 N
·
m
(200 - 250 kgf
·
m, 1450 - 1810 lbft)
6. Follow the same procedure to retract the track frame on the
other side.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......