OPERATION
MACHINE OPERATIONS AND CONTROLS
3-95
3. Operate bucket control lever (3) and arm control lever (4)
slowly to move the bucket cylinder and arm cylinder to the
end of the stroke.
4. Operate the bucket for 30 seconds and the arm for 30 sec-
onds in turn fully for 5 minutes.
(A): Arm is pushed out
(B): Arm is pulled in
(C): Bucket is pushed out
(D): Bucket is pulled in
NOTICE
When the work equipment is retracted, take care that it does not interfere with the machine body or
ground.
5. If the swing lock switch (6) is set to the ON (actuated) position
and swing control lever (5) is operated at full stroke, oil tem-
peraturerise can be increased earlier.
(E): Left swing
(F): Right swing
6. After carrying out the warming-up operation, check that all the
gauges on machine monitor (6) and the caution lamps are in
the following conditions.
q
Radiator water level monitor (7): OFF
q
Engine oil level monitor (8): OFF
q
Charge monitor (9): OFF
q
Fuel level monitor (10): Green display
q
Engine water temperature monitor (11): Green display
q
Engine oil pressure monitor (12): OFF
q
Engine water temperature gauge (13):
Indicator in black range
q
Fuel gauge (14): Indicator in black range
q
Preheating monitor (15): OFF
q
Air cleaner clogging monitor (16): OFF
q
Hydraulic oil temperature gauge (17):
Indicator in black range
q
Hydraulic oil temperature monitor (18): Green display
7. Check that there is no abnormal exhaust gas color, noise or vibration. If any abnormality is found, contact your
Komatsu distributor.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......