MAINTENANCE PROCEDURE
MAINTENANCE
4-72
EVERY 4000 HOURS MAINTENENCE
4
Maintenance for every 10, 100, 250, 500, 1000 and 2000 hours service should be carried out at the same time.
CHECK WATER PUMP
4
Check if there is oil leakage, water leakage, or clogging of the drain hole. If any abnormality is found, contact your
Komatsu distributor for disassembly and repair or replacement.
CHECK VIBRATION DAMPER
4
There may be leakage from the damper, dents, or face runout, so please contact your Komatsu distributor for
replacement.
CHECK FAN PULLEY AND TENSION PULLEY
4
Inspect the pulley for play and grease leakage.
If any fault is detected, ask Komatsu distributor to disassemble and repair or replace.
REPLACE INJECTOR ASSEMBLY
Please contact your Komatsu distributor to have the injector assembly replaced.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......