MACHINE OPERATIONS AND CONTROLS
OPERATION
3-88
7. If there are any items where the maintenance time has
passed, maintenance interval monitor (16) lights up for 30
seconds. Press maintenance switch (17), check the item,
then carry out maintenance immediately.
For details of the method of checking the maintenance inter-
val, see "Maintenance Switch (3-22)" in the Explanation of
components.
8. Press lamp switch (18) and check that the front lamp lights
up.
If it does not light up, there is probably a blown bulb or discon-
nection, so contact your Komatsu distributor for repairs.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......