TRANSPORTATION
OPERATION
3-126
SHIPPING MACHINE INFORMATION
3
WARNING
q
When loading the machine, choose firm level ground. Keep well away from the road shoulder.
q
Run the engine at low speed and operate slowly.
After placing the machine on the specified position of the trailer, secure it according to the following procedure.
1. Set all the control levers securely at LOCK position (L) with
lock lever (1).
2. When transporting the machine, place wooden blocks under
the front and rear track shoes to prevent the machine from
moving. Also, hold it down with chains or wire rope of a suit-
able strength. Be particularly careful to ensure that the
machine does not slip sideways.
Summary of Contents for PC600-7
Page 2: ...1 1 FOREWORD 11 ...
Page 4: ...FOREWORD FOREWORD 1 3 ...
Page 5: ...FOREWORD FOREWORD 1 4 ...
Page 18: ...2 1 SAFETY 12 ...
Page 22: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 28: ...SAFETY SAFETY LABELS 2 11 19 Jump start prohibited 09842 A0481 ...
Page 59: ...3 1 OPERATION 13 ...
Page 168: ...MACHINE OPERATIONS AND CONTROLS OPERATION 3 110 Boom operation Bucket operation ...
Page 211: ...4 1 MAINTENANCE 4 ...
Page 277: ...MAINTENANCE MAINTENANCE PROCEDURE 4 67 q Center frame A Important check points q Boom ...
Page 288: ...5 1 SPECIFICATIONS 15 ...
Page 291: ...6 1 ATTACHMENTS AND OPTIONS 16 ...
Page 299: ......