4.4 Power-on Sequence
C141-E171-03EN
4-7
4.4 Power-on Sequence
Figure 4.4 describes the operation sequence of the disk drive at power-on. The
outline is described below.
a)
After the power is turned on, the disk drive executes the MPU bus test,
internal register read/write test, and work RAM read/write test. When the
self-diagnosis terminates successfully, the disk drive starts the spindle motor.
b)
The disk drive executes self-diagnosis (data buffer read/write test) after
enabling response to the ATA bus.
c)
After confirming that the spindle motor has reached rated speed, the head
assembly is loaded on the disk.
d)
The disk drive positions the heads onto the SA area and reads out the system
information.
e)
The disk drive sets up a requirement for execution of self-seek-calibration.
This collects data for VCM torque and mechanical external forces applied to
the actuator, and updates the calibrating value.
f)
The drive becomes ready. The host can issue commands.
Summary of Contents for MHS2020AT
Page 1: ...C141 E171 03EN MHS2060AT MHS2040AT MHS2030AT MHS2020AT DISK DRIVES PRODUCT MANUAL ...
Page 4: ...This page is intentionally left blank ...
Page 8: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 34: ...This page is intentionally left blank ...
Page 40: ...This page is intentionally left blank ...
Page 60: ...Theory of Device Operation 4 6 C141 E171 03EN Figure 4 3 Circuit Configuration ...
Page 190: ...Interface 5 114 C141 E171 03EN g d f f d e Figure 5 7 Normal DMA data transfer ...
Page 240: ...This page is intentionally left blank ...
Page 244: ...This page is intentionally left blank ...
Page 246: ...This page is intentionally left blank ...
Page 250: ...This page is intentionally left blank ...
Page 252: ...This page is intentionally left blank ...
Page 253: ......
Page 254: ......