Work flow example
Preparations
Prepare schedule of works
↓
Refrigerant check
•
Always check the refrigerant to be used.
•
Always use the specified refrigerant.
•
Prepare materials/tools matched to refrigerant
↓
Operation chart preparation
↓
Start of work
Indoor unit and RB unit installation
↓
Refrigerant piping work
•
Use copper tube of specified material and thickness
to meet endurance pressure of the pipe. (609 psi [4.2
MPa])
•
Do not use pipe with dust and dirt sticking to it during
piping connection work.
•
Always flow dry nitrogen through piping while braz-
ing.
↓
Drain piping work
↓
Duct work
↓
Installation work
↓
Remote controller installation
↓
Electrical wiring work
Do not connect to the power supply.
↓
Outdoor unit foundation work
↓
Outdoor unit installation
2-1. Important items when using refrigerant (R410A)
- (06-15) -
2. Piping design
SYSTEM
DESIGN
SYSTEM
DESIGN
Summary of Contents for AIRSTAGE J-IIIL
Page 1: ...DESIGN TECHNICAL MANUAL ...
Page 3: ...1 GENERAL INFORMATION 2019 11 01 DV_CH01_J3LU061EF_02 ...
Page 20: ...2 5 Others 01 16 2 Optional parts GENERAL INFORMATION GENERAL INFORMATION ...
Page 21: ...2 MODEL SELECTION 2019 11 01 DV_CH02_J3LU061EF_02 ...
Page 94: ...5 1 Stand alone 02 72 5 Heating capacity table Outdoor unit MODEL SELECTION MODEL SELECTION ...
Page 95: ...3 OUTDOOR UNITS 2019 03 07 DV_CH03_J3LU061EF_01 ...
Page 120: ...11 1 Stand alone 03 24 11 Accessories OUTDOOR UNITS OUTDOOR UNITS ...
Page 121: ...4 INDOOR UNITS 2019 11 01 DV_CH04_J3LU061EF_02 ...
Page 337: ...5 CONTROL SYSTEM 2019 11 01 DV_CH05_VR2E018EF_04 ...
Page 521: ...6 SYSTEM DESIGN 2019 11 01 DV_CH06_J3LU061EF_02 ...
Page 599: ...7 FUNCTION SETTINGS 2019 11 01 DV_CH07_J3LU061EF_02 ...
Page 753: ...8 EXTERNAL INPUT AND OUTPUT 2019 11 01 DV_CH08_J3LU061EF_02 ...
Page 831: ...9 NOTES 2019 11 01 DV_CH09_J3LU061EF_04 ...
Page 850: ...4 2 Wiring connection 09 18 4 About connection between series NOTES NOTES ...
Page 851: ...10 OPTIONAL PARTS 2019 11 01 DV_CH10_VR2E018EF_05 ...