6-25
897N203029A FDC NX600 Instruction Manual 2022.01
6 Maintenance
4. Follow the on-screen instructions to pre-
pare for the leak check.
5. Tap the nozzle to be checked to select it,
and then run the leak check.
Once check ends, the Check results screen ap-
pears.
CAUTION:
Keep your fingers clear as the sampler unit
and consumable disk move.
6. Check the results of the [Sampler leak
check].
If the check results are [OK], it is not necessary
to replace the O-ring.
NOTE
The check results can be printed by
tapping the
button.
6