4-4
897N203029A FDC NX600 Instruction Manual 2022.01
4 Applicable Usage Methods
CP sample rack
Diluent for CRP
CP
8. Prepare for measurement of calibrator
CP1.
NOTE
A set of calibration requires 6 CRP
slides in total.
(a) Set the sample rack for the calibrator CP.
NOTE
Set the sample rack securely so that it
does not rise up.
(b) Insert 2 CRP slides into the slide cartridge
and set them on the analyzer.
NOTE
Set the slide cartridge securely so that it
does not rise up.
Otherwise, the slide reading error may
occur.
(c) Open the lid of the CP and place it in the
sample rack.
IMPORTANT:
The CP should be open no more than 5 minutes
during a single calibration.
(d) Close the sampler cover, and then lock it
with the sampler cover lock.
IMPORTANT:
Always lock the sampler cover with a key during
sample processing to prevent injuries and infec-
tion.
When the display reads [Ready to test], the sam-
pler cover can be opened.
4