Testing backup
power mode
NOTE!
Danger from immediate inverter operation in backup power mode without a con-
nection to the grid having been previously established.
During grid-connected operation, the inverter recognises and stores the direction
of phase rotation in the household network.
Without a grid connection, no information is available regarding the direction of
rotation and the inverter feeds energy with a default direction of rotation.
This can cause the three-phase consumers in the household network to experi-
ence errors.
Backup power mode should be tested once it has been installed and set up for
the first time. A battery state of charge of over 30% is recommended when in
test mode.
A description of how to perform the test operation can be found in the chapter
"Backup power checklist" of the document "Fronius Energy Package - Examples
of backup power switchover".
79
EN
Summary of Contents for Energy Package
Page 2: ......
Page 10: ...10...
Page 11: ...General information 11...
Page 12: ...12...
Page 37: ...Operation 37...
Page 38: ...38...
Page 69: ...Fronius system monitoring 69...
Page 70: ...70...
Page 82: ...82...
Page 83: ...Current data services and settings offered by Fronius system monitor ing 83...
Page 84: ...84...
Page 121: ...Troubleshooting and maintenance 121...
Page 122: ...122...
Page 136: ...136...
Page 137: ...Appendix 137...
Page 138: ...138...
Page 145: ...145 EN...
Page 146: ...146...
Page 147: ...147 EN...
Page 148: ......