
tem. Depending on the insolation conditions and size of the systems concerned,
the charging process can take a very long time.
If the "permit battery charging from DNO grid" setting is activated, the calibra-
tion charging process is performed by drawing a constant current from the
photovoltaic system and the distribution network operator's grid.
Permitted bat-
tery control
parameters
The following battery control parameters are possible
-
Maximum charging power
-
Minimum charging power
-
Maximum discharging power
-
Minimum discharging power
A parameter always consists of one of the four limitations above and the times
during which the limitation applies. At any one time, none, one or a maximum of
two limitations that are compatible with one another can be active.
Maximum charging and discharging limits
The max. charging and max. discharging power can be configured at the same time.
Discharging
limit
Discharge / charge
0 W
Charging
limit
Max. dis-
charging
2000 W
Max. char-
ging
2000 W
107
EN
Summary of Contents for Energy Package
Page 2: ......
Page 10: ...10...
Page 11: ...General information 11...
Page 12: ...12...
Page 37: ...Operation 37...
Page 38: ...38...
Page 69: ...Fronius system monitoring 69...
Page 70: ...70...
Page 82: ...82...
Page 83: ...Current data services and settings offered by Fronius system monitor ing 83...
Page 84: ...84...
Page 121: ...Troubleshooting and maintenance 121...
Page 122: ...122...
Page 136: ...136...
Page 137: ...Appendix 137...
Page 138: ...138...
Page 145: ...145 EN...
Page 146: ...146...
Page 147: ...147 EN...
Page 148: ......