
Pressure
Controller/Calibrator
Repair and Replacement
27
Remove and Replace Handles
To remove or replace the Product handles, see Figure 11:
1. Use a 2.5 mm hex wrench to remove the three M4 x 8 socket cap screws
on the side of each handle
.
2. With the same wrench, remove the two socket-cap screws on the front of
each handle
.
1
2
hxn201.eps
Figure 11. Replace the Handles
Summary of Contents for 6270A
Page 6: ...6270A Service Manual iv...
Page 26: ...6270A Service Manual 20 2 1 3 hxn212 eps Figure 7 PMM and PCM Removal...
Page 30: ...6270A Service Manual 24 1 2 3 hxn205 eps Figure 9 Manifold Installation...
Page 32: ...6270A Service Manual 26 2 1 1 hxn202 eps Figure 10 Remove Feet and Tilt Stands...
Page 40: ...6270A Service Manual 34 hxn208 eps Figure 16 Remove the CPU...
Page 43: ...Pressure Controller Calibrator Module Guide Rails 37 8 9 10 hxn219 eps Figure 18 Dock Assembly...
Page 64: ...6270A Service Manual 58 1 2 3 4 5 7 6 hxn210 eps Figure 32 Remove Latch Assembly...
Page 67: ...Pressure Controller Calibrator PCM Assembly 61 2 1 hxn401 eps Figure 34 Module Components...