
HyPower-Geko
Commissioning
FläktGroup DC-2014-0022-GB 2018-05/R5 • Subject to modifications
107
7.8
Switch on unit
•
Apply mains supply voltage.The unit is switched on via a MATRIX control panel, a
miniature switch of 983 series or a controller by others.
For instructions, refer to the operation manual enclosed with the relevant control
panel.
•
Switch the unit on using the control panel.
•
Test the fan speeds.
Pos. 1:
Control panel MATRIX OP44C
Pos. 2:
Control panel MATRIX OP51C
Danger of electrical current!
The electric switch cabinet (terminal box) is open.
Direct interventions in the electric switch cabinet (terminal box) are not permitted!
Before completing work on the air treatment unit, ensure that the electrical control
box is properly closed (refer to "Connection with controls provided by others" on
page 56).
Fig. 7-12: Switching the unit on using the control panel
1
2
User instructions!
The position of the speed selection switch (only OP5X/OP21X/OP3XX/OP44X) can
be mechanically limited.
The limitation should be set in such a way that the maximum adjustable fan speed
corresponds to that of the unit.
For details on the limitation, refer to the operation manual for the control panel.